1.5 Applying Finish

Apply Finish:

  • Using a clean mop or applicator, apply three coats of top coat (finish), allowing at least 30 minutes to dry between coats.
  • Keep 20cm from edges, except for the last coat which should go up to the edges.
  • Leave for six or more hours to cure, then buff the floor with Jackeroo Lite pads on ultra-high speed buffer, or red pads on medium-speed buffer. (Use white UHS pads for the first week with 3D-GLOSS.)

TIP:
Clean mops, pads and buckets with hot water and hang to dry. If applicators are to be used again soon, place in a clean black garbage bag and seal the end so the fringe stays wet until next use.